JOTP-011
5 December 2014
APPENDIX B. TEST PROGRAM FOR SURFACE AND UNDERWATER
LAUNCHED MUNITIONS
ANNEX 2. EMPIRICAL S3 TEST PROGRAM
Munition Hazard
Software Safety Assessment
(inert non‐sequential
(live non‐sequential
Initial Inspection
Classification Testing
tests and assessments)
8.5.3
tests and assessments)
7.1
(TBD) 8.5.1
Inert Rocket Motor
Firing Circuits
inert
live sequential
sequential
Case Test Sequence
Insensitive Munitions
8.5.4
tests
tests
(10) D.2
Assessment Testing
(TBD) 8.5.2
E3 Tests 8.5.6 / H.1
(36)
(may contain EID's/ESAD's)
Common Carrier Vibration
Common Carrier Vibration
Fuze Safety Testing
(18) C.2‐1.1
(18) C.2‐1.1
HERO
(TBD) 8.5.5
H.1‐1
Humid Heat
Packaged Transit Drop
Packaged Transit Drop
Munition Demil/Disposal
ESD
(36) C.1‐1
(18) C.2‐1.2
(18) C.2‐1.2
Assessment
H.1‐2
(TBD) 8.5.7
Lightning Hazard
Low Temperature Storage
(inert)
(36) C.1‐2
Render Safe Procedure
H.1‐3
Testing
(TBD) 8.5.8
9 day High Temperature Storage
Operational & Maintenance
(36) C.1‐3
8.5.13
Range Safety
(TBD) 8.5.9
28 day High Temperature Cycle
Weapon Danger Area Analysis
(36) C.1‐4
D.1‐1c
Explosive Material
Qualification
Solar Radiation
Mould Growth/
(TBD) 8.5.10
(36) C.1‐5
Contamination by Fluids
C.1‐13/14
Platform Integration/
Thermal Shock
Launch Safety
(36) C.1‐6
Pressurization
(TBD) 8.5.12
(Underwater Launched Munitions)
Sea Transport Dynamics
Sea Transport Dynamics
C.1‐7
(18) C.2‐3
(18) C.2‐3
Other Safety Tests
(TBD) 8.5.14
Air Transport Dynamics
Air Transport Dynamics
12m Logistic Drop Test
(18) C.2‐4
(18) C.2‐4
INSPECTION
(3) C.2‐8
Land Transport Dynamics ‐ Military
Land Transport Dynamics ‐ Military
LEGEND
Shipboard UNDEX Shock
(18) C.2‐2
(18) C.2‐2
(Safe for Disposal)
(1) C.2‐3.2
Level 1
(Basic)
Tactical Combat Platform Dynamics
Tactical Combat Platform Dynamics
Warhead Arena
Inspection
(18) C.2‐5
(18) C.2‐5
(4) D.2‐4
7.2
(9)
(9)
Level 2
Lightning Hazard (live)
Dynamic
Tactical Drop
Tactical Drop
(Intermediate)
(1) H.1‐3
Firing Tests
(10)
(10)
(9) C.2‐6
(9) C.2‐6
Inspection
(20) D.2
(ambient)
(cold)
7.3
Health Hazard Assessment
Component
8.5.11
(5)
(5)
Tests
Level 3
(10) D.2
(Reduced BTCA)
Inspection
Climatic Tests
(1)
(1)
7.4 / Appendix E
and BTCA
(2)
(2)
(4) C.1 and E
Cargo Aircraft Decompression
Cargo Aircraft Decompression
(1) C.1‐10
(1) C.1‐10
FLOW CHART
LEGEND
Rail/Horizontal Impact*
Rail/Horizontal Impact*
(1) C.2‐1.3
(1) C.2‐1.3
Cold
Hot
Amb
Rough Handling Transit Drop
Rough Handling Transit Drop
(1) C.2‐7
(1) C.2‐7
Temperature Determined by
Test Requirement
See Detailed Flow Chart
Decision**
Decision**
Hot Flow Quantity
(xx)
Disposal
Disposal
Cold Flow Quantity
(xx)
* See rail impact discussion in paragraph A‐1‐3.1.1.3b.
XX.X‐X = procedure reference
(Appendix. Annex‐Paragraph)
** If munition survives the drop test determine whether to dispose of the munition or to disassemble for BTCA.
Figure B2-1. Test flowchart for Empirical S3 Test Program.
B.2-4
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business