JOTP-011
5 December 2014
APPENDIX B. TEST PROGRAM FOR SURFACE AND UNDERWATER
LAUNCHED MUNITIONS
ANNEX 1. ANALYTICAL S3 TEST PROGRAM
Munition Hazard
Software Safety Assessment
(inert non‐sequential
(live non‐sequential
Initial Inspection
Classification Testing
tests and assessments)
8.5.3
tests and assessments)
7.1
(TBD) 8.5.1
Inert Rocket Motor
inert
Firing Circuits
live sequential
sequential
Case Test Sequence
Insensitive Munitions
8.5.4
tests
tests
(10) D.2
Assessment Testing
(TBD) 8.5.2
E3 Tests 8.5.6 / H.1
(20)
(may contain EID's/ESAD's)
Common Carrier Vibration
Common Carrier Vibration
Fuze Safety Testing
(10) C.2‐1.1
(10) C.2‐1.1
HERO
(TBD) 8.5.5
H.1‐1
Humid Heat
Packaged Transit Drop
Packaged Transit Drop
Munition Demil/Disposal
ESD
(20) C.1‐1
(10) C.2‐1.2
(10) C.2‐1.2
Assessment
H.1‐2
(TBD) 8.5.7
Lightning Hazard
Low Temperature Storage
(inert)
(20) C.1‐2
Render Safe Procedure
H.1‐3
Testing
(TBD) 8.5.8
9 day High Temperature Storage
Operational & Maintenance
(20) C.1‐3
Range Safety
8.5.13
(TBD) 8.5.9
28 day High Temperature Cycle
Weapon Danger Area Analysis
(20) C.1‐4
D.1‐1c
Explosive Material
Qualification
Solar Radiation
(TBD) 8.5.10
Mould Growth/
(20) C.1‐5
Contamination by Fluids
C.1‐13/14
Platform Integration/
Thermal Shock
Launch Safety
(20) C.1‐6
Pressurization
(TBD) 8.5.12
(Underwater Launched Munitions)
Sea Transport Dynamics
Sea Transport Dynamics
C.1‐7
(10) C.2‐3
(10) C.2‐3
Other Safety Tests
(TBD) 8.5.14
Air Transport Dynamics
Air Transport Dynamics
12m Logistic Drop Test
(10) C.2‐4
(10) C.2‐4
(3) C.2‐8
Land Transport Dynamics ‐ Military
Land Transport Dynamics ‐ Military
Shipboard UNDEX Shock
INSPECTION
(10) C.2‐2
(10) C.2‐2
(Safe for Disposal)
(1) C.2‐3.2
LEGEND
Tactical Combat Platform Dynamics
Tactical Combat Platform Dynamics
Warhead Arena
(10) C.2‐5
(10) C.2‐5
Level 1
(4) D.2‐4
(Basic)
Inspection
Dynamic
Dynamic
Lightning Hazard (live)
Tactical Drop
Tactical Drop
7.2
Firing Tests*
Firing Tests*
(1) H.1‐3
(2)
(2)
(5) C.2‐6
(5) C.2‐6
(2) D.1
(2) D.1
Level 2
Health Hazard Assessment
(Intermediate)
Munition Flight Dynamics
Munition Flight Dynamics
8.5.11
Inspection
(8) C.2‐10
(8) C.2‐10
(ambient)
(cold)
Component
7.3
(5)
Tests
(5)
(10) D.2
Level 3
(1)
(1)
(2)
(2)
(Full BTCA)
Climatic Tests
Inspection
Cargo Aircraft Decompression
Cargo Aircraft Decompression
and BTCA
7.4 / Appendix E
(1) C.1‐10
(1) C.1‐10
(4) C.1 and E
Rail/Horizontal Impact**
Rail/Horizontal Impact**
FLOW CHART
(1) C.2‐1.3
(1) C.2‐1.3
LEGEND
Rough Handling Transit Drop
Rough Handling Transit Drop
(1) C.2‐7
(1) C.2‐7
Cold
Hot
Amb
Temperature Determined by
Decision***
Decision***
Test Requirement
See Detailed Flow Chart
Disposal
Disposal
Hot Flow Quantity
(xx)
* For canistered munitions with ripple/rapid firing capability, at least 4 dynamic firings are required to test for
Cold Flow Quantity
(xx)
safe separation from the launch platform. This can be reduced to 2 dynamic firings for single munition launch
canisters. The dynamic firing tests may be eliminated, if safe separation does not need to be demonstrated.
XX.X‐X = procedure reference
** See rail impact discussion in paragraph A.1‐3.1.1.3b.
(Appendix. Annex‐Paragraph)
*** If munition survives the drop test determine whether to dispose of the munition or to disassemble for BTCA.
Figure B1-1. Test flowchart for Analytical S3 Test Program.
B.1-5
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business